منطقه صنعتی تانگشی، شهر Gaobu، شهر DongGuan استان گوانگدونگ، چین
خانه محصولاتخط تولید اسفنجی

Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V

Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V

  • Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V
  • Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V
Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V
جزئیات محصول:
Place of Origin: Guangdong, China (Mainland)
نام تجاری: ZHMACH
گواهی: CE
Model Number: ZHF-2017
پرداخت:
Minimum Order Quantity: one set
قیمت: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
مخاطب
توضیحات محصول جزئیات
نوع محصول: دستگاه فوم سازی خودکار به طور مداوم ولتاژ: 380 ولت
پمپ ماشینی: پمپ وایکینگ آمریکا/ژاپنی نوع فوم: جعبه سرریز و سر اسپری
سیستم کشش RS: سیستم کشش R.S با فیلم پلاستیکی خدمات پس از فروش ارائه شده است: مهندسین در دسترس برای خدمات ماشین آلات در خارج از کشور
سرعت کف کردن: 2000r/min-7000r/min نوار نقاله: برای فوم ورق بلند 50 متر نوار نقاله
روش کف کردن: سر اسپری و جعبه سرریز بلوک برش: تیغه و اره چاقوی دوتایی دندان نوع/ نوع تیغه/نوع دندان اره
برجسته:

ماشین آلات تولید فوم pu

,

دستگاه اسفنج سازی

,

خط تولید اسفنج فشار قوی

 

Continuouse High Pressure Spray Sponge Production Line for Mattress and Pillow

 

The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.

 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

Main technique specification:

 

Dimension

Total length 35m×Total width 4m×Total Height 3m

Foaming material Group 13 groups, man-machine interface, both manual and automatically computer control
Foaming width

980mm~2250mm

Foaming height

Max 1200mm

Foaming density

8Kg/m³~100kg/m³

Foaming speed

2000r/min~7000r/min

Max total output

300kg/min

 

Material spraying way ① The way of down sprayer head (upper, down, front, back can be adjusted)     ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw

 
Type Use

Specification

Qty
Big material tank PPG 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank POP 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tank CaCo3 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank TDI 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tank Flame retardant

2m³/δ3m stainless steel, with filter system

1
Big material tank MC

2m³/δ2mm stainless steel, with filter system

1
Small material tank Si 180L/δ1mm stainless steel 1
Small material tank A-33 180L/δ1mm stainless steel, with filter system 1
Small material tank T9 180L/δ1mm stainless steel, with filter system 1
Small material tank H2O 180L/δ1mm stainless steel 1
Small material tank Color 180L/δ1mm stainless 1
Small material tank Anti-yellow 180L/δ1mm stainless steel 1
Small material tank Black 180L/δ1mm stainless steel 1
Floor powder mixing tank PPG, POP, Powder 1.5m³/δ3mmA3 steel plate, with filter system 1
Filter tank POP, Powder

1.5m³/δ4mmA3 steel plate

1

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

The main part of the machine

 

Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V 0

 

Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V 1

اطلاعات تماس
Dongguan Zehui machinery equipment co., ltd

تماس با شخص: Wang

تلفن: 0086-15817646348

ارسال درخواست خود را به طور مستقیم به ما (0 / 3000)

سایر محصولات