منطقه صنعتی تانگشی، شهر Gaobu، شهر DongGuan استان گوانگدونگ، چین
خانه محصولاتماشین پلی ¬ اورتان فوم

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

  • Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
  • Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
جزئیات محصول:
Place of Origin: Dongguan China
نام تجاری: ZHMACH
گواهی: CE Certificate
Model Number: ZHF-2017A
پرداخت:
Minimum Order Quantity: one set
قیمت: inquiry
Packaging Details: To be pack in paper with plastic film and wooden case water proof packing
Delivery Time: 45 days
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
مخاطب
توضیحات محصول جزئیات
ابعاد کلی: 35 متر * 4.5 متر * 3.2 متر ارتفاع محصول: Max. حداکثر 1300mm 1300 میلی متر
حداکثر ظرفیت: 200 تا 300 لیتر در دقیقه منطقه برنامه: اسفنج، فوم پلی اورتان، تشک، مبلمان
عرض محصول: 1200mm~2300mm (قابل تنظیم) ظرفیت: 2000mm/min~7000mm/min
مدل فومینگ: تمام اتوماتیک ماده خام: PPG، TDI، MC، A33، T9، روغن سیلیکون، H2O، پیگمنت، Ect
سیستم R.S: سیستم RSpulling با فیلم پلاستیکی نوار نقاله: برای فوم ورق بلند 50 متر نوار نقاله
برجسته:

دستگاه فوم پلی اورتان

,

تجهیزات فوم پلی اورتان

,

دستگاه فوم پلی اورتان پیوسته

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

 

This Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming.

 

Main technique specification:

 

1, Dimension:Total length 40m×Total width 4m×Total Height 3m

 

2, Foaming material Group: 13 groups, man-machine interface, both manual and computerized control.

 

3, Foaming width: 980mm~2350mm

 

4, Foaming height: Max 1300mm

 

5, Foaming density: 8Kg/m³~100kg/m³

 

6, Foaming speed: 2000r/min~7000r/min

 

7, Max total output:300kg/min

 

8, Material spraying way:

 

① The way of down sprayer head (upper, down, front, back can be adjusted)

② The way of trough overflow pipe.

 

9, Controlling way of foaming:

 

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box.

 

10, Mixing –head motor: 37kw

 

11, Total power: About 90kw

 

 

Transducer Types

 

Model Power/kw

Use

 

Qty Brand
FC360 37

Mixing head

 

1 Danfoss
FC-051P 7.5

PPG+CaCo3

 

1 Danfoss
FC-051P 5.5

PPG

 

1 Danfoss
FC-051P 4

TDI

 

1 Danfoss
FC-051P 2.2

MC , Flame retardant

 

2 Danfoss
FC-051P 1.5

Black

 

1 Danfoss
FC-051P 0.75 Water, Ann, Si, Tin, Color A/B Anti-yellow 7 Danfoss
FC-051P 0.75

Spray head

 

1 Danfoss
FC-051P 5.5/3.7/1.5 Oven inner conveyer line,side conveyer line, cutting machine 3 Danfoss
FC-051P 7.5

Conveyor belt

 

1 Danfoss

 

 

Pump of loding material

 

Model

Specification

 

Use Qty/set Brand
KCB-83.3

200L/min

 

PPG Loding 1 China
CB-13

200 L/min

 

PPG+CaCo3 loding 1 China
NB-63

120 L/min

 

TDI loding 1 Shanghai
NB-32

30 L/min

 

MC loding 1 Shanghai
KCB-55 25 L/min Flame retardant loding 1 China

 

 

Techniques and After-sale Services:

 

1,Buyer should assist seller to undertake the testing. Both seller and buyer should be responsible for the on-site testing of the production line. The testing is mainly for three formulas including high, medium and low density.

 

2,During the testing, If the raw material waste is caused by seller’s technical problems or the quality of the production line (i.e. foam collapse, burnings, or machine malfunction), the additional portion of the raw materials that over 2 tons are on seller’s account. The problems not related to seller’s are on buyer’s account.

 

3,During installation, seller will send technicians to buyer’s place of business. Buyer should arrange his staffs to assist the technicians with the installation, and prepare water, electricity and place for installation.

 

4,The machines are in simple packing.

 

5,During installation and testing, buyer is responsible for the food, Visa fee, turn-round flight tickets and accommodation for the technicians sent by seller. Buyer also should pay $40/day/person as the allowance for the technicians sent by the seller.

 

6,The machines are under one year warranty (in the circumstance of normal use). Natural damage, non-professional demolition, maintenance errors are not within the scope of warranty.

 

7,After warranty period, seller will provide paid service for machine maintenance.

 

 

Payment Terms:

 

After signing of the contract, buyer pays as the advance payment 30% of total price , when seller gets the deposit, the contract takes into effect; the balance of 70%will be paid by buyer before shipment.

 

 

 

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit 0

 

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit 1

اطلاعات تماس
Dongguan Zehui machinery equipment co., ltd

تماس با شخص: Wang

تلفن: 0086-15817646348

ارسال درخواست خود را به طور مستقیم به ما (0 / 3000)

سایر محصولات